Rafako S.A. experiences related to flue gas desulphurization plants

  • This paper describes RAFAKO S. A. experiences related to flue gas desulphurization plants (FGD) particularly to wet FGD plants for Belchatow Power Station and semi-dry FGD for Siersza PS and Lodz CHP in Poland. There are presented the basic characteristics, operation parameters, guar an tee performance and experiences related to design process, erection, start-up, commissioning, operation and possibilities of their utilization in the future projects. There are briefly described some construction and exploitation problems and applied methods of their solving.
  • Keywords
    FGD plants, semidry FGD, experiences, construction and exploitation
  • Pages
    105 - 120
  • UDC
    662.992.84-912
  • BIBLID
    0350-218X, 30 (2004), 1-4, 105-120